How to read the result
- Any material: a cubic yard is a volume, so the same number applies to soil, gravel, mulch, sand or anything else that fills the space. Only the weight changes with the material.
- Volume, not weight: tons need a material weight. Leave the weight blank for volume only, or enter your supplier's figure to see the weight.
- Depth in inches, size in feet: the calculator converts for you. If you measure depth in feet, divide by 27 instead of 324 (the factor for inches).
- Borders and rings: for edging round a bed or a ring of mulch round a tree, choose a border and give the outside size and the border width. A 2 ft border round a 20 × 10 ft bed is 104.0 ft², so at 4 in deep it needs 1.28 yd³. A 2 ft ring inside a 10 ft circle at 3 in is 0.47 yd³, and the ring between a 12 ft and a 4 ft circle at 3 in is 0.93 yd³.
- Cost: type the price per cubic yard your supplier quotes, and the cost is the total volume times that price. At $45 a yard, 0.93 yd³ costs $41.67. The page never fills in a price for you.
- The allowance is yours to choose: the default is 0%, which gives the exact volume. Material settles and some is spilled, so add a small percentage when you order.
Once you have the volume, you can turn it into an order: the Concrete Volume Calculator for concrete and bags, the Gravel Calculator or Topsoil Calculator for loose material, and the Cubic Yards to Tons Calculator when it is sold by weight. For more shape options or several different pieces, use the Cubic Feet Calculator.
Worked example
A flat bed 10 ft long and 10 ft wide, filled to 3 in deep, with no allowance.
- Area = 10 × 10 = 100 ft²
- Depth = 3 ÷ 12 = 0.25 ft
- Cubic feet = 100 × 0.25 = 25.00 ft³
- Cubic yards = 25.00 ÷ 27 = 0.93 yd³ (0.71 m³)
- Coverage: one cubic yard covers 27 ÷ 0.25 = 108.0 ft² at 3 in
These are the same numbers the calculator shows when it first loads.
Method and formulas
Cubic yards = A × d × pieces × (1 + allowance ÷ 100) ÷ 27
Rectangle: A = L × W · Circle: A = π × D² ÷ 4 · Triangle: A = b × h ÷ 2
Rectangle border: A = L × W − (L − 2B)(W − 2B) · Circle border: A = π ÷ 4 × [D² − (D − 2B)²] · Ring: A = π ÷ 4 × (D² − d²)
Cost = cubic yards × your price per cubic yard
1 yd³ = 27 ft³ = 0.7646 m³ · Weight = volume × material weight
- A
- Area of one piece, ft² (m² in metric)
- d
- Depth, in feet (inches ÷ 12)
- B
- Border width, measured in from the outside edge
- D, d
- Outside and inside diameter
- pieces
- Number of identical pieces (1 for a single area)
Assumptions and limits
- Uniform depth over the whole shape.
- Weight (if entered) is the loose weight of the material as supplied.
- Gives volume. Weight is only as good as the material weight you enter; it varies with moisture, grading and compaction.
- Not a design or a take-off from drawings; an irregular area is split into simple shapes and added by the reader, or entered as a known area.
Reference tables
| Depth | Cubic yards per 100 ft² | ft² covered by 1 yd³ |
|---|---|---|
| 1 in | 0.31 | 324.0 |
| 2 in | 0.62 | 162.0 |
| 3 in | 0.93 | 108.0 |
| 4 in | 1.23 | 81.0 |
| 6 in | 1.85 | 54.0 |
| 8 in | 2.47 | 40.5 |
| 12 in | 3.70 | 27.0 |
Source: Calculated with the EngiFormula cubic yard engine (method v1.1). 1 yd³ = 27 ft³, from the exact definitions 1 ft = 0.3048 m and 1 yd = 0.9144 m, NIST Special Publication 811 (2008 edition), Appendix B.
Weight of gravel and stone
| Material | Loose kg/m³ | Loose lb/yd³ |
|---|---|---|
| Gravel — Pitrun | 1,930 | 3,250 |
| Gravel — Dry | 1,510 | 2,550 |
| Gravel — Dry 6-50 mm (1/4"-2") | 1,690 | 2,850 |
| Gravel — Wet 6-50 mm (1/4"-2") | 2,020 | 3,400 |
| Sand & gravel — Dry | 1,720 | 2,900 |
| Sand & gravel — Wet | 2,020 | 3,400 |
| Stone — Crushed | 1,600 | 2,700 |
Source: Caterpillar Performance Handbook, Edition 50 (AEXQ3330), Tables section, "Weight of Materials", page 27-6 (loose weights).
Values as printed in the handbook, which adds: “Varies with moisture content, grain size, degree of compaction, etc. Tests must be made to determine exact material characteristics.” The calculator uses the kg/m³ figure you enter; the handbook rounds the lb/yd³ column separately. Soil, sand and mulch weights vary widely, so use your supplier's figure.
Common uses
Garden beds, mulch and topsoil
Choose Rectangle for a bed, enter its length, width and the depth you want. For an irregular bed, split it into rectangles, circles and triangles, add their areas, then use "I already know the area".
Fill for a low area, a pit or a pile
Use the average depth of the fill. If the depth changes a lot across the area, work it out in sections and add the volumes together.
Round holes and piers
Choose Circle and enter the diameter and the depth. For several identical holes, enter the count under "Number of identical pieces".
Gravel for a path or driveway
Enter the length, width and depth of the gravel layer. To order by weight, add the loose weight from your supplier or the table above and read the tons.
Frequently asked questions
How do I calculate cubic yards?
Multiply length × width × depth in feet to get cubic feet, then divide by 27. For a 10 × 10 ft area at 3 in deep, the depth is 0.25 ft, so 100 × 0.25 = 25.00 ft³, and 25.00 ÷ 27 = 0.93 yd³.
How do I calculate cubic yards from square feet?
Square feet alone are not enough, because a cubic yard is a volume and needs a depth. Multiply the area by the depth in feet, then divide by 27. In the calculator, choose "I already know the area". For example, 100 ft² at 3 in deep is 0.93 yd³; the table above gives other depths.
How many cubic feet are in a cubic yard?
There are 27 cubic feet in a cubic yard, because a yard is 3 feet and 3 × 3 × 3 = 27. In metric, one cubic yard is 0.7646 m³.
How many square feet does a cubic yard cover?
It depends on the depth. Divide 27 by the depth in feet. At 3 in deep, one cubic yard covers 108.0 ft²; at 2 in it covers 162.0 ft² and at 4 in it covers 81.0 ft².
How do I calculate cubic yards for a circle or round hole?
Find the area with π × diameter² ÷ 4, then multiply by the depth and divide by 27. A circle 4 ft across has an area of 12.57 ft²; at 6 in deep that is 6.28 ft³, or 0.23 yd³.
How many cubic yards of soil, gravel or mulch do I need?
The volume is the same whatever the material: measure the area and the depth you want, and the calculator gives the cubic yards. Add a small allowance for settling and spillage, and ask your supplier how they round the order.
How do I convert cubic yards to tons?
Multiply the volume by the weight of the material. Enter the loose weight in the optional field to see the tons. At 1,690 kg/m³, the handbook figure for dry 1/4 in to 2 in gravel, one cubic yard weighs about 1.42 short tons, so the 0.93 yd³ example weighs about 1.32 tons. Soil and mulch weigh differently, so use your supplier's figure.
Is this an online cubic yard calculator for soil or mulch?
Yes. This free online cubic yard calculator works for soil, mulch, gravel or any other loose material: enter the length, width and depth and read the cubic yards. Add a small allowance for settling.
Sources and references
- NIST Special Publication 811, Guide for the Use of the International System of Units (SI), 2008 edition, Appendix B (exact values for the inch, foot and yard).
- Caterpillar Inc., Caterpillar Performance Handbook, Edition 50 (AEXQ3330, © 2021), Tables section, "Weight of Materials", page 27-6 (loose weights of gravel and stone).
- Area relations: plane geometry, as set out in the Method section above.
About this calculator
Scope and disclaimer
Calculates volume (and an optional weight) for ordering and hauling. Not a design or a take-off from drawings.
This calculator gives information and preliminary estimates only. It is not professional design advice and does not replace the governing code, product instructions or a qualified professional's judgement for your project.