Asphalt Millings Calculator

Enter the length, width and compacted thickness of the area. You get the tons of recycled asphalt millings to order, the cubic yards rolled and loose, how far one ton goes and the truck loads, in US or metric units.

  • Tons to order
  • Rolled and loose yards
  • Coverage per ton
  • Truck loads
  • US and metric

Enter the area to cover

Units
ft
ft
in
lb/ft³
%
%
tons
$/ton

The thickness after the millings are rolled, not the height of the pile from the truck. You decide this; 3 in is an example.

112.5 lb/ft³ is the middle of the range of 100 to 125 lb/ft³ that the U.S. Federal Highway Administration gives for compacted reclaimed asphalt. Use the figure your supplier gives if you have it.

An allowance you can change, not a calculation. 5% is an example.

Only used for the loose volume in the truck. The tons do not change. 25% is an example; ask your supplier.

Your own truck. 15 tons is an example, not a rule.

Millings to order (including the extra)

7.38 tons

Area
500 ft² (46.5 m²)
Rolled volume (compacted)
4.86 yd³
Loose volume in the truck
6.08 yd³
One ton covers
71 ft² per ton
Truck loads
1 load
Weight in the other unit
6.70 tonnes
Estimated material cost
Add a price to see the cost

Order about 7.38 tons of millings. That is 4.86 yd³ once rolled and about 6.08 yd³ loose in the truck. Suppliers sell by the ton, so ask them for their own weight per cubic yard.

Show the working

  1. Area = 50 × 10 ft = 500 ft² (46.5 m²)
  2. Rolled volume = area × 3 in ÷ 12 × 1.05 ÷ 27 = 4.86 yd³
  3. Weight = rolled volume × 27 × 112.5 lb/ft³ ÷ 2,000 = 7.38 tons
  4. One ton covers = 2,000 ÷ (112.5 lb/ft³ × 3 in ÷ 12) = 71 ft² per ton
  5. Loose volume = rolled volume × (1 + 25% shrink) = 6.08 yd³
  6. Truck loads = 7.38 tons ÷ 15 tons per load, rounded up = 1

What you can do with this calculator

  1. Work out how many tons of asphalt millings to order. Enter the length, width and compacted thickness to get the tons for a driveway or lane.
  2. See how far a ton goes. The page shows the square feet one ton covers at your thickness, and a table for 2, 3, 4 and 6 inches.
  3. Check the cubic yards and truck loads. Get the rolled and the loose cubic yards and the number of truck loads for the delivery.

How to read the result

  • Compacted, not loose: enter the thickness after the millings are rolled. A loose pile from the truck is taller than the finished layer.
  • Tons, not yards: millings are sold by the ton. The weight ordered is the same whether the millings are loose or rolled; only the volume changes. The calculator shows short tons (2,000 lb) in US units and tonnes in metric.
  • The weight figure matters: 112.5 lb/ft³ (1.52 tons per cubic yard) is the middle of the FHWA range of 100 to 125 lb/ft³ for compacted reclaimed asphalt. That range is 1.35 to 1.69 tons per cubic yard. Moisture and how finely the millings are crushed change it, so use the figure your supplier gives if you have it.
  • Rolled and loose volume: the loose volume uses the shrink you enter (25% in the example). It is an allowance for the truck, not a measured value.
  • What this page does not decide: the thickness, the base and the drainage for your traffic come from your supplier, local specification or engineer. The page works out quantities only.

For hot mix asphalt on a new surface, use the Asphalt Calculator. A stone base under the millings can be ordered with the Road Base Calculator. This page gives quantities only: the thickness, base and drainage for your traffic come from your supplier, local specification or engineer, and millings vary with moisture and crushing, so use your supplier’s weight when you have it.

Worked example

An area 50 ft long and 10 ft wide, 3 in compacted thickness, at 112.5 lb/ft³, with 5% extra, 25% shrink and a 15 ton truck (your own numbers go here).

  1. Volume = 50 × 10 × (3 ÷ 12) = 125 ft³ = 4.63 yd³
  2. Weight = 125 × 112.5 = 14,062.5 lb
  3. Tons = 14,062.5 ÷ 2,000 = 7.03 tons
  4. With 5% extra: 7.03 × 1.05 = 7.38 tons (6.70 tonnes), which is 4.86 yd³ rolled
  5. One ton covers 2,000 ÷ (112.5 × 3 ÷ 12) = 71 ft² per ton
  6. Loose volume = 4.86 yd³ × (1 + 25%) = 6.08 yd³ (4.65 m³)
  7. Truck loads = 7.38 tons ÷ 15 tons = 1 load (rounded up)

These are the same numbers the calculator shows when it first loads.

Method and formulas

Volume = length × width × (thickness ÷ 12) × (1 + extra) in ft³ · Weight = volume × unit weight γ · Short tons = weight ÷ 2,000
Cubic yards = ft³ ÷ 27 · Loose volume = rolled volume × (1 + shrink) · Area one ton covers = 2,000 ÷ (γ × thickness ÷ 12) · Truck loads = tons ÷ truck load, rounded up

γ
Unit weight of the compacted millings: 112.5 lb/ft³ by default, in the FHWA range of 100 to 125 lb/ft³
extra
Allowance for settling and uneven ground that you enter
shrink
How much the loose pile shrinks when rolled, an allowance that you enter; it does not change the tons

Assumptions and limits

  • A rectangle of one compacted thickness over the whole area; the area is the length times the width.
  • The weight of the compacted millings is one value for the whole job; the default is the middle of the FHWA compacted range, not a property of every pile.
  • Tons are short tons (2,000 lb) in US units and tonnes in metric; the weight ordered is the same whether the millings are loose or rolled.
  • A quantity helper, not a pavement design: it does not choose the thickness, the base or the drainage; use your supplier, local specification or engineer.
  • Millings vary with moisture, crushing and source; use the weight your supplier gives when you have it.
  • Rectangles only; no price is supplied (the reader enters it), no delivery or minimum-load charges.
  • The shrink allowance and the truck load are examples you can change, not sourced values.

Reference tables

How far one short ton of compacted millings goes, by thickness (at 112.5 lb/ft³)
Compacted thicknessSquare feet per tonSquare yards per tonTons per 1,000 ft²
2 in10711.99.38
3 in717.914.06
4 in535.918.75
6 in364.028.13

Source: Calculated with the EngiFormula asphalt millings engine (method v1.0) at 112.5 lb/ft³, the middle of the FHWA range for compacted reclaimed asphalt. Short ton = 2,000 lb; 1 yd³ = 27 ft³; unit conversions use the exact definitions in NIST Special Publication 811 (2008 edition), Appendix B.

Tons of compacted millings per 1,000 square feet, at the low, middle and high weights of the FHWA range
Compacted thickness100 lb/ft³112.5 lb/ft³125 lb/ft³
2 in8.339.3810.42
3 in12.5014.0615.63
4 in16.6718.7520.83
6 in25.0028.1331.25

Source: U.S. Federal Highway Administration, User Guidelines for Waste and Byproduct Materials in Pavement Construction, Reclaimed Asphalt Pavement user guideline (embankment or fill), FHWA-RD-97-148: compacted unit weight of RAP 1,600 to 2,000 kg/m³ (100 to 125 lb/ft³). A supplier’s stockpile weight can differ with moisture and crushing.

Common uses

A gravel-style driveway or farm lane

Enter the length, width and the rolled thickness you plan, then read the tons to order. Add your supplier’s price per ton to see the material cost.

A parking area or yard

Use a rectangle for each part of the area and add the tons. Put a base stone under the millings if your supplier or specification says so; the road base tab works out the stone.

Checking a quote or a delivery

Compare the tons quoted with the tons here, and ask whether the supplier’s weight per cubic yard matches the weight you entered.

Planning the trucks

Enter your truck load to see how many loads the tons need.

Frequently asked questions

How do you calculate how many tons of asphalt millings you need?

Multiply the length, width and compacted thickness (in feet) to get cubic feet, multiply by the weight of the compacted millings, and divide by 2,000. For a 50 ft by 10 ft area at 3 in and 112.5 lb/ft³ that is 125 ft³ × 112.5 ÷ 2,000 = 7.03 tons, or 7.38 tons with 5% extra.

How much does a cubic yard of asphalt millings weigh?

The FHWA gives 100 to 125 lb/ft³ for compacted reclaimed asphalt, which is 1.35 to 1.69 tons per cubic yard, and 1.52 tons at the 112.5 lb/ft³ this page starts from. Loose millings weigh less per cubic yard, and moisture adds weight. Calculators on other sites use different figures, so ask your supplier for theirs and type it in.

How far does a ton of asphalt millings go?

At 112.5 lb/ft³, one ton covers about 107 ft² at 2 in, 71 ft² at 3 in, 53 ft² at 4 in and 36 ft² at 6 in (see the table above).

How thick should asphalt millings be on a driveway?

This page cannot say. The right thickness depends on the base, the traffic and the local specification, so ask your supplier or an engineer. The calculator shows the quantity at whatever thickness you enter, and the table shows 2, 3, 4 and 6 inches.

How many cubic yards of loose millings equal one rolled yard?

It depends on the millings and how they are rolled, and the sources disagree, so the page does not claim a value. You enter the shrink; at 25% the 4.86 yd³ rolled needs 6.08 yd³ loose. The tons do not change.

How much extra should I order?

Some extra is usual for settling and uneven ground. The page starts at 5% as an example and you can change it. For the 50 ft by 10 ft area that adds 0.35 tons.

Sources and references

  • U.S. Federal Highway Administration, User Guidelines for Waste and Byproduct Materials in Pavement Construction, Reclaimed Asphalt Pavement user guideline (embankment or fill), FHWA-RD-97-148: compacted unit weight of RAP 1,600 to 2,000 kg/m³ (100 to 125 lb/ft³).
  • NIST Special Publication 811, Guide for the Use of the International System of Units (SI), 2008 edition, Appendix B (exact values for the inch, foot, yard and pound).
  • Area of a rectangle and volume of a prism: plane and solid geometry, as set out in the Method section above.

About this calculator

Method version: 1.0 Last technical update:

Scope and disclaimer

The tons, volume, coverage and truck loads of recycled asphalt millings for a rectangular area at one compacted thickness. Not a pavement design, base, drainage or price tool.

This calculator gives information and preliminary estimates only. It is not professional design advice and does not replace the governing code, product instructions or a qualified professional's judgement for your project.