Skip to content

Concrete Footing Calculator

Enter the footing sizes from your plan to get the concrete to order, rounded up to the half yard, and the number of bags if you are mixing your own. This page works out quantity only; it does not size a footing.

  • Footings from your plan
  • Rounded up to the half yard
  • Bags if mixing your own
  • Cost from your own price
  • US and metric

Enter your footing

Units
ft
ft
ft
in
in

Example sizes are only there to show the arithmetic: take the width, depth and length from your plan. Up to three groups are added into one total, for example a strip around the house and round piers for the porch.

%
$/yd³

A 10% allowance is a common ordering rule for uneven sub-grade and spillage. A trench dug wider or deeper than the form needs more, so raise it if yours is.

Concrete to order (including allowance)

3.62 yd³

Ready-mix order, rounded up to the next ½ yd³
4.0 yd³ (3.06 m³)
Bags of premixed concrete
163 bags (80 lb)
Strip length used
100.0 ft
Concrete per foot of strip, or per pad or pier (group 1)
0.889 ft³ per ft of strip
Volume in cubic feet
97.8 ft³
Volume in the other unit
2.77 m³
Estimated ready-mix cost
Add a price to see the cost

Order about 4.0 yd³ (3.06 m³) of ready-mix (rounded up to the next half yard), or about 163 bags (80 lb) of premixed concrete. Suppliers sell in set amounts and may have a minimum load, so ask before you order.

Show the working

  1. Run of footing = 2 × (30 + 20) ft = 100.0 ft
  2. Concrete = run × 1.333 ft wide × (8 in ÷ 12) deep = 88.89 ft³
  3. Concrete to order = 88.89 ft³ × 1.10 ÷ 27 = 3.62 yd³
  4. Ready-mix line = 3.62 yd³ rounded up to the next half yard = 4.0 yd³
  5. Bags = 97.78 ft³ ÷ 0.6 ft³ per 80 lb bag, rounded up = 163

What you can do with this calculator

  1. Use it as a concrete footing calculator. Enter the width and depth of a strip, pad or round footing and get cubic yards and bags.
  2. Work out foundation concrete. Enter the building outline and the page adds up the strip footing around it, plus interior walls.
  3. Plan deck footings. Choose round footings, enter the diameter, depth and number of piers.
  4. Count the bags. Pick a 40, 50, 60 or 80 lb bag to see how many to mix yourself.

How to read the result

  • Strip, pad or round: a strip footing runs under a wall, a pad sits under a post or column, and a round footing or pier is a cylinder. Pick the one that matches your plan, or add up to three groups for a job that has more than one.
  • Footing depth is concrete depth: the depth here is the thickness of the concrete, not how far below the ground the trench goes.
  • Building outline: measure the length and width of the footing outline to the centre of the footing, and the page adds 2 × (length + width), so corners are not counted twice. Add the total length of any interior wall footings in the optional field.
  • Why an allowance, and why the half yard: a ready-mix supplier advises a 10% allowance for uneven sub-grade and spillage, then rounding up to the closest half yard. A trench dug wider or deeper than the form takes more, so raise the allowance if yours is.
  • What this page does not decide: how wide or deep a footing must be depends on the soil, the loads, the frost depth and the local building code. Take those sizes from your plan, your building department or an engineer.

The footing needs steel as well: the Rebar Calculator gives the bars to buy and their weight. To price the concrete order, use the Concrete Cost Estimator.

Worked example

A strip footing around a 30 × 20 ft outline, 16 in wide and 8 in deep, with 10% extra, using 80 lb bags.

  1. Run length = 2 × (30 + 20) = 100 ft
  2. Cross-section = (16 ÷ 12) × (8 ÷ 12) = 0.889 ft², so 0.889 ft³ per ft of strip
  3. Volume = 100 × 0.889 = 88.9 ft³ = 88.9 ÷ 27 = 3.29 yd³
  4. With 10% extra: 3.29 × 1.1 = 3.62 yd³ (2.77 m³) = 97.8 ft³; rounded up to the next half yard, order 4.0 yd³ (3.06 m³)
  5. Bags = 97.8 ÷ 0.6 ft³ per 80 lb bag = 163.0, rounded up to 163 bags (80 lb)

Add 6 round piers, 12 in across and 8 in deep, as a second group: each holds 0.524 ft³, so 6 hold 3.14 ft³, and the total with 10% extra is 3.75 yd³, order 4.0 yd³ (3.06 m³).

The first four steps are the same numbers the calculator shows when it first loads.

Method and formulas

Strip: V = run length × width × depth, run length = 2 × (outline length + outline width) + interior length
Pad: V = length × width × depth × number · Round: V = π × d² ÷ 4 × depth × number
Total = (sum of the groups) × (1 + w ÷ 100) · Order = total in yd³ rounded up to the next ½ yd³
Bags = total ÷ yield per bag, rounded up · 1 yd³ = 27 ft³ = 0.764554857984 m³

width, depth, d
Footing width and depth of concrete, and diameter of a round footing
number
Number of identical pads or piers in the group
w
Waste and over-excavation allowance, %
yield
Volume of mixed concrete one bag makes, from the manufacturer's data sheet

Assumptions and limits

  • Each footing group has a uniform cross-section over its whole length.
  • Strip length from the outline is the perimeter of the rectangle entered; corners are not counted twice and wall openings are not deducted.
  • Dimensions are those of the concrete poured (the form), not of the trench; a trench dug wider or deeper than the form is covered only by the allowance.
  • Reinforcing steel and anchor bolts are ignored; the volume they displace is small and sits inside the allowance.
  • Bag yields are QUIKRETE Concrete Mix No. 1101 figures; other brands list their own yields.
  • Gives the quantity of concrete for footing sizes the reader already has. It does not size a footing: width, depth, reinforcement, bearing on the soil and frost depth come from the plan, the soil report and the local building code or an engineer.
  • Default dimensions are examples to show the arithmetic, not a recommendation.
  • Not a design check, a permit document or a take-off from drawings; stepped footings, footings with a stem wall, bell bases and sloping trenches are split into simple shapes by the reader.
  • Does not work out rebar, excavation, formwork or gravel; use the linked calculators when they are live.

Reference tables

Cubic yards of concrete per 100 feet of strip footing, by width and depth, before allowance
Depth12 in wide16 in wide20 in wide24 in wide
6 in1.852.473.093.70
8 in2.473.294.124.94
10 in3.094.125.146.17
12 in3.704.946.177.41

Source: Calculated with the EngiFormula footing engine (method v1.0). Unit conversion uses the exact definitions 1 in = 25.4 mm, 1 ft = 0.3048 m and 1 yd = 0.9144 m, NIST Special Publication 811 (2008 edition), Appendix B. Before any allowance.

Round footings and piers

Concrete in one round footing, before allowance
Diameterft³ at 8 in deepft³ at 12 in deep80 lb bags at 12 in deep
8 in0.2330.3491
10 in0.3640.5451
12 in0.5240.7852
16 in0.9311.3963
18 in1.1781.7673
24 in2.0943.1426

Source: Calculated with the EngiFormula footing engine (method v1.0). Unit conversion uses the exact definitions 1 in = 25.4 mm, 1 ft = 0.3048 m and 1 yd = 0.9144 m, NIST Special Publication 811 (2008 edition), Appendix B. Before any allowance. Bags use the QUIKRETE No. 1101 yield for the selected bag.

Bags per cubic yard

Yield per bag and bags per cubic yard (QUIKRETE No. 1101)
Bag sizeYield per bag (approx.)Bags per cubic yard
40 lb0.3 ft³90
50 lb0.375 ft³72
60 lb0.45 ft³60
80 lb0.6 ft³45

Source: QUIKRETE Concrete Mix No. 1101 data sheet, revised October 2022, page 1: each yield is "approximately". Bags per cubic yard = 27 ft³ ÷ yield, rounded up.

Charts and diagrams

Footing shapes and the dimensions used Three small drawings: a strip footing in cross-section with its width and depth marked, with a building outline showing the length and width that give the run; a rectangular pad with length, width and depth; and a round pier with diameter and depth. width depth strip outline length × width run = perimeter pad length × width depth round pier diameter depth
Footing depth is the thickness of concrete, not the depth of the trench. Strip volume = run length × width × depth.

Common uses

  • Strip footing under a house, garage or shed: choose Strip, enter the outline length and width, the footing width and depth.
  • Deck, porch or pergola piers: choose Round footing or pier, enter the diameter, depth and number of piers; add a pad group for any square footings.
  • Spot footings under posts and columns: choose Rectangular pad and enter its length, width, depth and how many.
  • Checking a quote: compare your order line and bag count with the supplier's figures at the same allowance.

Frequently asked questions

How do I calculate the concrete for a footing?

Multiply the length, width and depth, all in feet (divide inches by 12), to get cubic feet, then divide by 27 for cubic yards. For the 100 ft strip above, 16 in wide and 8 in deep, that is 100 × 0.889 = 88.9 ft³, or 3.29 yd³, before the allowance.

How many bags of concrete do I need for a footing?

Divide the volume in cubic feet by the yield of one bag and round up. For the strip above with 10% extra, that is 97.8 ÷ 0.6 = 163.0, so 163 bags (80 lb). The QUIKRETE No. 1101 data sheet gives an 80 lb bag a yield of approximately 0.6 ft³, which is 45 bags per cubic yard. Yields are approximate and differ by brand.

How much extra concrete should I order for a footing?

A ready-mix supplier, Superior Materials, advises a 10% allowance for uneven sub-grade, spillage and similar losses, then rounding up to the closest half yard. The calculator starts at 10% and shows the half-yard order line. A trench dug wider or deeper than the form needs more, so raise the allowance if yours is. It is easier to cancel a truck than to add one.

How wide and deep should a footing be?

This page does not decide that. The width and depth of a footing depend on the soil it bears on, the loads it carries, the frost depth and the local building code. Take them from your plan, your building department or an engineer; then enter them here to get the quantity of concrete.

How much concrete do I need for deck footings?

Choose Round footing or pier, enter the diameter and depth from your deck plan, and the number of piers. For 6 piers 12 in across and 8 in deep, that is 3.14 ft³ before the allowance. The pier size and depth come from your deck plan and permit, not from this page.

How do I find the length of a strip footing around a house?

Use the building outline option: enter the outline length and width and the page works out 2 × (length + width). For 30 × 20 ft that is 100 ft. Add the total length of footings under interior walls in the optional field, or choose "Total length I already know" and type the run yourself.

Does rebar change how much concrete I need?

Not enough to matter here. Reinforcing steel displaces a small share of the volume, and the page ignores it; the allowance covers it. How much rebar a footing needs is a separate question that depends on the design.

Should I use bags or ready-mix for a footing?

The bag count shows the scale of the job: the strip above takes 163 bags (80 lb). Ready-mix is ordered by the cubic yard, rounded up to the half yard, so compare the order line and your supplier's price with the cost of the bags and the work of mixing them. Suppliers may have a minimum load, so ask before you order.

Is this a foundation concrete calculator, or a concrete calculator for deck footings?

Both, for footings. It covers strip, pad and round footings, including the piers of a deck. For a foundation with walls, work out the walls separately with the Concrete Volume Calculator and add them. The sizes come from your plan, not from this page.

Sources and references

About this calculator

Method version: 1.0 Last technical update:

Scope and disclaimer

Calculates the quantity of concrete for footings whose size the reader already has. It does not size a footing or check it against soil, loads or the building code. The bag count uses the QUIKRETE No. 1101 yields; another brand can differ, so check the bag.

This calculator gives information and preliminary estimates only. It is not professional design advice and does not replace the governing code, product instructions or a qualified professional's judgement for your project.