How to read the result
- Slope is the fall divided by the horizontal run, in the same unit. The same slope can be written as 2.08%, 0.250 in/ft, 20.83 mm/m, 1 in 48.0 or an angle of 1.193°. The page shows all of them, so you can match a drawing, a spec or the markings on a level.
- Run is the level distance between the two ends, not the length of the sloping pipe. The pipe is very slightly longer: 50.011 ft for a 50.00 ft run at this slope.
- Downstream invert elevation is the starting elevation minus the fall, both measured at the inside bottom of the pipe. From a 100 ft start it is 98.958 ft.
- Several segments in a row: choose "Several segments in a row" to give each part of the run its own slope, in any slope unit. The page adds the falls in order and gives the invert at every joint. For 30 ft at 2%, then 25 ft at 1%, then 40 ft at 1/4 in per foot from 100 ft, the joints are at 99.400 ft and 99.150 ft and the far end at 98.317 ft. Each segment gets its own full-pipe flow; the flattest one carries the least.
- Full-pipe flow and velocity come from Manning's equation with the slope you enter and the roughness n for the pipe wall. They are the capacity of a pipe running full (145.7 gpm (0.325 ft³/s), 3.72 ft/s here), not what a drain actually carries, which is usually a part-full flow. The Pipe Flow Calculator gives part-full flow and the maximum flow.
- A steeper slope carries more. Doubling the slope to 4.17% raises the full-pipe flow of this pipe to 206.1 gpm (0.459 ft³/s), but it also raises the speed to 5.26 ft/s. This page does not say how much slope is enough or too much for a given use.
- No code table or verdict. Minimum slopes for drainage pipe come from the plumbing or drainage code that applies where you build, and depend on pipe size and use. This calculator converts and checks the numbers you enter; it does not tell you whether a slope is allowed. Ask your building department which code applies.
This tool assumes a straight pipe at one constant slope. It does not size pipes for a rainfall or fixture load, and does not check venting, trap arms, cleanouts, cover or frost.
To write a slope as a percent, degrees, ratio or inches per foot from rise and run, use the Percent Slope Calculator. For the flow of a pipe that runs part full, with its maximum flow, use the Pipe Flow Calculator. This page does not say whether a slope is allowed. That comes from the code that applies or the engineer.
Worked example
A drain runs 50 ft level at 0.25 in of fall per foot (1/4 in/ft), in a 4 in PVC pipe (n = 0.011), starting at an invert elevation of 100 ft. Find the drop, the far-end level and the full-pipe flow.
- Slope = 1/4 ÷ 12 = 0.020833, which is 2.08% (0.250 in/ft, 20.83 mm/m, 1 in 48.0, 1.193°)
- Fall = run × slope = 50 ft × 0.020833 = 12.50 in (1.042 ft)
- Pipe length = √(run² + fall²) = 50.011 ft
- Downstream invert = 100 ft − 1.042 ft = 98.958 ft
- Full-pipe flow: Q = (1.486/n)·A·R2/3·S1/2 with A = π D² ÷ 4 and R = D ÷ 4 = 145.7 gpm (0.325 ft³/s)
- Full-pipe velocity = Q ÷ A = 3.72 ft/s
At 1/8 in/ft the same run drops 6.25 in (0.521 ft), and carries 103.0 gpm (0.230 ft³/s) full. Going the other way, a fall of 3.5 in over a 14 ft run is a slope of 2.08% (0.250 in/ft, 1 in 48.0); a fall of 6 in at 1/4 in/ft needs a run of 24.00 ft. These are the same numbers the calculator gives.
Method and formulas
Slope = fall ÷ run · Fall = run × slope · Run = fall ÷ slope
Percent = slope × 100 · Inches per foot = slope × 12 · mm per metre = slope × 1,000 · Ratio 1 in N with N = 1 ÷ slope
Angle = arctan(slope) · Pipe length = √(run² + fall²) · Downstream invert = start − fall
Several segments: invert at the end of segment k = start − (run1 × slope1 + … + runk × slopek)
Q = (1/n) · A · R2/3 · S1/2 (US customary units use 1.486/n), full pipe: A = π D² ÷ 4, R = D ÷ 4
- Run, fall
- The horizontal distance and the vertical drop, in the same unit when you divide
- S
- The slope as a decimal (rise per unit of run), used as the energy slope
- n
- Manning's roughness of the pipe wall
- D
- Pipe inside diameter; A is the flow area and R the hydraulic radius
Assumptions and limits
- Slope is fall divided by the horizontal run.
- Constant slope over the whole run; fall measured between the inside bottoms (inverts) of the pipe.
- Full-pipe capacity uses uniform flow with the slope as the energy slope (the difference between tan and sin of the angle is far below 1% for drain slopes).
- Manning n constant and entered by you or taken from the cited table.
- A geometry and capacity helper, not a drainage design: it does not size pipes for a rainfall, count fixtures or check venting, trap arms, cleanouts, cover or freezing.
- No code table and no verdict: the page does not say whether a slope is allowed. Minimum slopes come from the code that applies where you build, and the building department decides.
- Capacity is for a full pipe in steady uniform flow; it is not a check that solids will move (self-cleansing velocity) and does not cover pressure or pumped lines.
Reference tables
| Fall per foot | Percent slope | Ratio | Millimetres per metre | Angle |
|---|---|---|---|---|
| 1/16 in/ft | 0.521% | 1 in 192.0 | 5.21 mm/m | 0.298° |
| 1/8 in/ft | 1.042% | 1 in 96.0 | 10.42 mm/m | 0.597° |
| 3/16 in/ft | 1.563% | 1 in 64.0 | 15.63 mm/m | 0.895° |
| 1/4 in/ft | 2.083% | 1 in 48.0 | 20.83 mm/m | 1.193° |
| 3/8 in/ft | 3.125% | 1 in 32.0 | 31.25 mm/m | 1.790° |
| 1/2 in/ft | 4.167% | 1 in 24.0 | 41.67 mm/m | 2.386° |
| 3/4 in/ft | 6.250% | 1 in 16.0 | 62.50 mm/m | 3.576° |
| 1 in/ft | 8.333% | 1 in 12.0 | 83.33 mm/m | 4.764° |
Source: Calculated with the EngiFormula pipe slope engine (method v1.1): slope = fall ÷ run, and full-pipe flow by Manning's equation (FHWA HEC-22, 4th edition, 2024, equation 6.5). Unit factors: 1 in = 25.4 mm and 1 ft = 0.3048 m exactly, NIST Special Publication 811 (2008 edition), Appendix B.
| Slope | Over 10 ft | Over 20 ft | Over 50 ft | Over 100 ft |
|---|---|---|---|---|
| 1/16 in/ft | 0.63 in | 1.25 in | 3.13 in | 6.25 in |
| 1/8 in/ft | 1.25 in | 2.50 in | 6.25 in | 12.50 in |
| 1/4 in/ft | 2.50 in | 5.00 in | 12.50 in | 25.00 in |
| 1/2 in/ft | 5.00 in | 10.00 in | 25.00 in | 50.00 in |
Source: Calculated with the EngiFormula pipe slope engine (method v1.1): slope = fall ÷ run, and full-pipe flow by Manning's equation (FHWA HEC-22, 4th edition, 2024, equation 6.5). Unit factors: 1 in = 25.4 mm and 1 ft = 0.3048 m exactly, NIST Special Publication 811 (2008 edition), Appendix B.
Manning's n values for storm drain pipe
Values are copied from FHWA HEC-22 (4th edition, 2024), Table 9.1. Use them for the full-pipe flow line, or enter the value from your design manual or the pipe maker.
| Pipe or conduit (wall) | Manning's n |
|---|---|
| Concrete Pipe (smooth) | 0.010–0.011 |
| Concrete Boxes (smooth) | 0.012–0.015 |
| Spiral Rib Metal Pipe (smooth) | 0.012–0.013 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 2-2/3 by 1/2 inch (annular) | 0.022–0.027 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 2-2/3 by 1/2 inch (helical) | 0.011–0.023 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 6 by 1 inch (helical) | 0.022–0.025 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 5 by 1 inch | 0.025–0.026 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 3 by 1 inch | 0.027–0.028 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 6 by 2 inch (structural plate) | 0.033–0.035 |
| Corrugated Metal Pipe, Pipe-Arch and Box: 9 by 2-1/2 inch (structural plate) | 0.033–0.037 |
| Corrugated Polyethylene (smooth) | 0.009–0.015 |
| Corrugated Polyethylene (corrugated) | 0.018–0.025 |
| Polyvinyl chloride (PVC) (smooth) | 0.009–0.011 |
Source: FHWA, Urban Drainage Design Manual (HEC-22), report FHWA-HIF-24-006, 4th edition, February 2024, Table 9.1 Manning's roughness coefficients for storm drain conduits.
For corrugated metal pipe, pipe-arch and box, Manning's n varies with barrel size. The manual adds: “HDS-5 (FHWA 2012a) documents laboratory-derived Manning's n values. Actual field values for culverts may vary depending on the effect of abrasion, corrosion, deflection, and joint conditions.”
Charts and diagrams
Show chart data as a table
| Run (ft) | Fall |
|---|---|
| 0 | 0 |
| 10 | 2.5 |
| 20 | 5 |
| 30 | 7.5 |
| 40 | 10 |
| 50 | 12.5 |
| 60 | 15 |
| 70 | 17.5 |
| 80 | 20 |
| 90 | 22.5 |
| 100 | 25 |
Source: Calculated with the EngiFormula pipe slope engine (method v1.1): slope = fall ÷ run, and full-pipe flow by Manning's equation (FHWA HEC-22, 4th edition, 2024, equation 6.5). Unit factors: 1 in = 25.4 mm and 1 ft = 0.3048 m exactly, NIST Special Publication 811 (2008 edition), Appendix B.
Common uses
- Setting the fall before digging: enter the run and slope to get the drop to dig to over the whole length.
- Checking a run you have: measure the fall over a known level distance and solve for the slope, then compare it with your drawing or local code.
- Finding the far-end level: enter the upstream invert elevation to get the downstream invert.
- A run with changes of slope: list each segment with its own slope to get the invert at every joint, for setting out or checking a survey.
- Converting a slope: a plan may give percent, a plumber thinks in inches per foot and a survey in 1 in N; the page shows all of them.
Frequently asked questions
What slope should a drain pipe have?
It depends on the pipe size, what the pipe carries and the code that applies where you build, so the answer is on your local plumbing or drainage code, not on this page. This calculator does not print a code table or say whether a slope is allowed. It turns the slope you choose into fall, percent, inches per foot and 1 in N, and shows what the pipe carries at that slope. Ask your building department which code applies.
How do you calculate the slope of a pipe?
Divide the fall by the horizontal run, in the same unit. A fall of 3.5 in over a 14 ft run is 3.5 ÷ 168 = 0.02083, which is 2.08% or 0.250 in/ft.
How much fall do I need for a given length of pipe?
Multiply the run by the slope. 50 ft at 0.250 in/ft needs 12.50 in (1.042 ft) of fall: 50 × 0.250 in/ft = 12.50 in. Use the level distance as the run, not the length of the pipe along the slope.
What is 1/4 inch per foot as a percent?
1/4 ÷ 12 × 100 = 2.08% (2.0833%), or 1 in 48.0. 1/8 in/ft is 1.04% (1 in 96.0). The table above lists the common slopes in every format.
Can a drain pipe have too much slope?
A steeper slope makes the water flow faster and the full-pipe capacity larger: doubling the slope of the 4 in pipe above raises the full-pipe velocity from 3.72 ft/s to 5.26 ft/s. Whether a given slope is too steep for a drain is set by the design guidance and code that apply to the job. This page does not state a limit.
How do you measure pipe slope on site?
Measure the fall over a known level distance, for example with a level and a tape, and enter both. Choose "Slope from run and fall" to read the slope. A fall of 3.5 in over 14 ft gives 0.250 in/ft.
What is the difference between slope, pitch and fall?
Fall is the vertical drop over the run, in inches or millimetres. Slope or pitch is the fall per unit of run, written as a percent, inches per foot or mm per metre. A ratio such as 1 in 48.0 is the same slope written as the run for each unit of fall. This page shows all of them for the value you enter.
Sources and references
- U.S. Federal Highway Administration, Urban Drainage Design Manual, Hydraulic Engineering Circular No. 22 (HEC-22), report FHWA-HIF-24-006, 4th edition, February 2024, Section 6.1.4 (Manning's equation) and Table 9.1 (Manning's n for storm drain conduits).
- Slope as fall ÷ run, the angle and the pipe length along the slope: plane geometry, as set out in the Method section above.
- NIST Special Publication 811, Guide for the Use of the International System of Units (SI), 2008 edition, Appendix B (exact values for the inch and the foot).
About this calculator
Scope and disclaimer
Fall, slope or run of a straight pipe at a constant slope, the slope in the usual site formats, the pipe length and downstream invert, and the full-pipe flow and velocity. Not a pipe-sizing, venting or code-compliance tool.