Rip Rap Calculator

Enter the area and the layer thickness to get the cubic yards and tons of rip rap to order, plus truck loads. You can type your supplier’s weight per yard.

  • Cubic yards and tons
  • Sloped banks
  • Your own density
  • Under-water layer
  • Truck loads

Enter the size

Units
ft
ft
in
%
tons/yd³
%
tons
$/ton

Take the thickness from your design or specification. HEC-23 asks for at least the largest stone size or 1.5 times the median stone size, and not under 1 ft (30 cm).

HEC-23 usually takes 2.65 and asks for at least 2.5. Granite and most quarry rock are about 2.6 to 2.8.

40% is our starting value for dumped angular stone. It is not from a standard: your supplier’s weight per yard is better.

If you enter a weight here, it replaces the specific gravity and the voids.

Waste and uneven ground. 10% is a practical allowance, not a figure from a standard; change it to suit the job.

Your own figure, for example from the haulier. The page assumes none.

Your own price. The page supplies none.

Rip rap to order (including the extra)

49.1 tons

Volume to order
36.7 yd³
Placed volume before the extra
33.3 yd³
Weight before the extra
44.7 tons
In the other unit
44.6 tonnes
Placed density used
1.34 tons/yd³
Area covered
600 ft²
Thickness used
18.0 in
One ton covers
13.4 ft²
Truck loads
Add a truck load to see it
Estimated cost
Add a price to see the cost

You need about 49.1 tons (36.7 yd³) of rip rap, allowance included, at 1.34 tons/yd³. Ask your supplier what their stone weighs per cubic yard and type it in to match their tons.

Show the working

  1. Area = 50 × 12 ft = 600 ft²
  2. Placed volume = 600 ft² × (18 in ÷ 12) ÷ 27 = 33.3 yd³
  3. With 10% extra: 33.3 yd³ × 1.10 = 36.7 yd³
  4. Placed density = 2.65 × water × (1 − 40%) = 1.34 tons/yd³
  5. Weight = 36.7 yd³ × 1.34 tons/yd³ = 49.1 tons
  6. One ton covers 600 ft² ÷ 44.7 tons = 13.4 ft²

What you can do with this calculator

  1. Work out rip rap tons and cubic yards. Enter the length, width and layer thickness for a stream bank, ditch or pond edge.
  2. Measure a sloped bank. Enter the bank length, bank height and side slope; the area along the slope is worked out for you.
  3. See how many tons are in a cubic yard. The weight comes from the stone specific gravity and voids, or from the figure your supplier gives.
  4. See how far a ton goes. See the area one ton covers at your layer thickness.
  5. Get truck loads and a cost. Enter your own truck load and price to see the loads and the cost.

How to read the result

  • How the quantity is worked out: the area times the layer thickness is the volume in place, the way FHWA describes payment by volume. The weight is that volume times the placed density of the stone. The extra covers waste and uneven ground.
  • Why the density matters: pages and suppliers quote anything from about 1.2 to 2 tons per cubic yard for rip rap, because it depends on the rock and how many voids are left between the stones. Here the density is worked out from the stone specific gravity and the voids (2.65 and 40% to start, 1.34 tons/yd³), and you can replace it with the figure your supplier gives. Nobody publishes one standard factor.
  • Measuring a bank: use the width along the slope, not the plan width. If you know the bank height and the side slope, choose “bank length × bank height and side slope”: the face is 4 × √(1 + 2²) = 8.94 ft wide for a 4 ft bank at 2:1, not 8 ft.
  • Layer thickness: take it from your design or the agency specification. FHWA HEC-23 asks for at least the largest stone size or 1.5 times the median stone size, and not under 1 ft; if the rock is placed under water, add 50% (18 in becomes 27 in). The page shows a note if you go under 1 ft.
  • What this page does not do: it does not choose the stone size or gradation, check stability, or work out filter fabric or bedding. Those come from the design. Use the Crushed Stone Calculator for bedding stone.

To turn a volume of rip rap into tons for a different density, use the Cubic Yards to Tons Calculator. Bedding or smaller stone under the rip rap can be worked out with the Crushed Stone Calculator. This page gives the quantity only: the stone size and gradation come from your design.

Worked example

A strip of bank 50 ft long and 12 ft wide along the slope, covered with 18 in of rip rap, with stone of specific gravity 2.65, 40% voids, a 10% extra and a 20-ton truck load (your own load goes here).

  1. Area = 50 × 12 = 600 ft²
  2. Thickness = 18 ÷ 12 = 1.50 ft
  3. Cubic feet = 600 × 1.50 = 900.0 ft³
  4. Cubic yards in place = 900.0 ÷ 27 = 33.33 yd³
  5. With a 10% extra: 33.33 × 1.10 = 36.7 yd³ (28.0 m³)
  6. Placed density = 2.65 × 1,000 kg/m³ × (1 − 40%) = 1,590 kg/m³ = 1.34 tons/yd³
  7. Weight = 36.7 yd³ × 1.34 tons/yd³ = 49.1 tons (44.6 tonnes)
  8. One ton covers 600 ft² ÷ 44.7 tons = 13.4 ft²
  9. Truck loads = 49.1 tons ÷ 20 tons = 3 loads (rounded up)

The same 50 ft of bank measured as a bank 4 ft high at 2:1 has a face 8.94 ft wide, an area of 447 ft², and needs 36.6 tons with the same stone and extra. Placed under water, the 18 in layer becomes 27.0 in and the order 73.7 tons. If your supplier says their stone is 1.5 tons per cubic yard, type it in and the order becomes 55.0 tons.

These are the same numbers the calculator shows when it first loads, apart from the truck load, which starts blank.

Method and formulas

Cubic yards = A × t × (1 + extra ÷ 100) ÷ 27 · A = length × width along the surface, or length × height × √(1 + z²), or the area you know
Placed density = specific gravity × 1,000 kg/m³ × (1 − voids ÷ 100), or the density your supplier gives
Weight = volume × placed density · Loads = weight ÷ truck load, rounded up · 1 yd³ = 27 ft³ = 0.7646 m³

A
Area of the surface covered, ft² (m² in metric)
t
Layer thickness, square to the surface, in feet (inches ÷ 12); +50% under water
z
Side slope, horizontal run per 1 vertical

Assumptions and limits

  • The result is the quantity of stone to order for a layer of the thickness you enter. It is not a design: the stone size, gradation, filter and extent come from your design or the agency specification.
  • Weight is volume times a placed density worked out from the stone specific gravity and the voids you choose (starting values 2.65 and 40%), or the density your supplier quotes. No authority publishes one tons-per-cubic-yard factor: the pages that do range from 1.2 to 2 tons per cubic yard.
  • Volume is the in-place volume, area × thickness measured square to the surface, as HEC-23 describes for payment by volume. Loose volume in the truck is larger.
  • The extra for waste and uneven ground is yours to set (10% to start); it is not a standard value.
  • Does not size the stone. The median stone size (D50), the gradation and the design velocity or wave check are engineering design (HEC-11, HEC-23, NCHRP 568) and are not worked out here.
  • The layer thickness is not checked against the stone size; the page shows the HEC-23 rule and the reader is responsible for it.
  • Filter fabric and bedding stone under the rip rap are not worked out; the Gravel and Crushed Stone calculators do bedding.
  • Grouted rip rap, gabions, wire-enclosed mattresses and concrete armour units are other systems and are not covered.
  • No price is supplied: a cost appears only from a price you type.

Reference tables

Placed density of rip rap, short tons per cubic yard (tonnes per cubic metre in brackets), by specific gravity and voids
Specific gravity30% voids35% voids40% voids45% voids
2.51.47 (1.75)1.37 (1.63)1.26 (1.50)1.16 (1.38)
2.651.56 (1.86)1.45 (1.72)1.34 (1.59)1.23 (1.46)
2.81.65 (1.96)1.53 (1.82)1.42 (1.68)1.30 (1.54)

Source: Calculated with the EngiFormula rip rap engine (method v1.0). 1 yd³ = 27 ft³, from the exact definitions 1 ft = 0.3048 m and 1 yd = 0.9144 m, and 1 lb = 0.45359237 kg, NIST Special Publication 811 (2008 edition), Appendix B. Placed density = specific gravity × 1,000 kg/m³ × (1 − voids).

Rip rap for 100 square feet by layer thickness, at the default density (no extra)
Layer thicknessCubic yardsShort tonsft² per ton
12 in3.704.9620.1
18 in5.567.4413.4
24 in7.419.9310.1
30 in9.2612.418.1
36 in11.1114.896.7

Source: Calculated with the EngiFormula rip rap engine (method v1.0). 1 yd³ = 27 ft³, from the exact definitions 1 ft = 0.3048 m and 1 yd = 0.9144 m, and 1 lb = 0.45359237 kg, NIST Special Publication 811 (2008 edition), Appendix B. Placed density = specific gravity × 1,000 kg/m³ × (1 − voids).

Layer thickness and stone rules (FHWA HEC-23)

What FHWA HEC-23 says about rip rap revetment layers
RuleHEC-23 Volume 2, Design Guideline 4
Minimum thicknessNot less than the spherical diameter of the D100 stone, nor less than 1.5 times the spherical diameter of the D50 stone, whichever is the greater thickness
Practical placementNot less than 1 ft (0.30 m)
Placed under waterThe thickness found from the two rules above is increased by 50%
Stone specific gravityUsually taken as 2.65; a minimum of 2.5 is typically required
Payment by volumeIn-place volume = the measured area of the surface the riprap is placed on × the thickness measured perpendicular to the surface

Source: FHWA, Hydraulic Engineering Circular No. 23, Volume 2 (FHWA-NHI-09-112), Third Edition, September 2009, Design Guideline 4 (Riprap Revetment), sections 4.2.3 and 4.2.4 and the measurement and payment text. The thickness rule there is quoted from NCHRP Report 568.

Common uses

Stream banks and ditches

Choose “bank length × bank height and side slope” or measure the width along the slope, and enter the layer thickness from your design.

Culvert outlets and pond edges

Use the length and width of the rock apron or edge, or the area if you know it.

Checking a delivery quote

Compare the tons on a quote with the result here. Type your supplier’s tons per cubic yard to match their figure, and your truck load to see the loads.

Under-water placement

Choose “Placed under water” to add 50% to the layer thickness, as HEC-23 describes.

Comparing densities

Change the specific gravity and the voids to see how much the order moves. The density table above shows the range.

Frequently asked questions

How many tons of rip rap are in a cubic yard?

There is no single standard factor. The weight of a cubic yard of placed rip rap is the specific gravity of the stone times the weight of water, less the voids between the stones. For stone of specific gravity 2.65 with 40% voids that is 1.34 tons/yd³ (1.59 tonnes per cubic metre). Other pages use anywhere from about 1.2 to 2 tons per cubic yard. HEC-23 gives the specific gravity (usually 2.65, at least 2.5) but no tons per cubic yard, so ask your supplier and type their figure into the calculator.

How much rip rap do I need?

Multiply the area by the layer thickness to get the volume in place, add an allowance for waste, and multiply by the density. For 600 ft² at 18 in, that is 33.33 yd³ in place, 36.7 yd³ with 10% extra, and 49.1 tons.

How thick should a rip rap layer be?

HEC-23 asks for a layer at least as thick as the largest stone (D100) or 1.5 times the median stone (D50), whichever is greater, and not under 1 ft. Add 50% if it is placed under water. The stone size itself comes from the design, so this page takes the thickness as an input and does not choose it.

How many square feet does a ton of rip rap cover?

It depends on the thickness and the density. At the default density, one ton covers 20.1 ft² at 12 in, 13.4 ft² at 18 in and 10.1 ft² at 24 in. The table above shows more depths.

What is the difference between rip rap and crushed stone or gravel?

Rip rap is large, angular rock, typically 6 in and up, placed to protect a bank or channel from moving water. Crushed stone and gravel are smaller. For those use the Crushed Stone Calculator or the Gravel Calculator.

What do the rip rap classes mean?

A class is a stone weight and size gradation set by each agency, and the classes are not the same from one state or agency to another. This page does not choose a class: use the one in your design or specification, and take the layer thickness that goes with it.

Do I need filter fabric under rip rap?

HEC-23 says riprap should be placed on bedding stone and/or a geotextile filter. Whether you need one, and which, is part of the design. This page does not work out the filter or bedding; use the Crushed Stone Calculator for a bedding layer.

Sources and references

About this calculator

Method version: 1.0 Last technical update:

Scope and disclaimer

Calculates the quantity of rip rap (cubic yards or cubic metres, tons or tonnes, coverage, truck loads) for a layer of a thickness you choose. It does not size the stone or check any design.

This calculator gives information and preliminary estimates only. It is not professional design advice and does not replace the governing code, product instructions or a qualified professional's judgement for your project.