How to read the result
- How the count works: each paver takes up its own size plus one joint on each side, so the count is the area divided by (paver length + joint) × (paver width + joint). For 6 × 9 in. pavers with a 1/8 in. joint that is 55.89 in², or 2.58 pavers per square foot. Counting the joint gives about 3.1% fewer pavers than ignoring it.
- The allowance depends on the pattern: cuts at the edges and breakage use pavers, and diagonal or herringbone patterns cut more. The page offers 10% for straight laying, 15% for herringbone or basket weave and 20% for diagonal or several sizes. These are common practice, not figures from a standard; enter your own if your supplier says otherwise.
- Base and bedding sand: the depths come from your plan, the paver maker or an installer. They depend on traffic, soil and frost, so this page does not choose them. The starting values (4 in. base, 1 in. sand) are only a place to start. The result adds 10% for compaction and spillage, which is a practical allowance, not a figure from a standard.
- Yards, tons and cost: stone and sand are sold by the cubic yard or by the ton. The weights are the Caterpillar handbook figures for loose material, or the figure your supplier gives. Cost uses only the prices you type in; the page supplies none.
- What it does not work out: edge restraint, polymeric (joint) sand, pallets, curves and layout drawings. Check how your supplier packs the pavers.
This page already gives the base stone and bedding sand for the patio. For sand on its own, use the Sand Calculator. For a bigger area or a driveway, the Road Base Calculator works out the base from its compacted thickness.
Worked example
A flat patio 12 ft long and 10 ft wide, laid with 6 × 9 in. pavers, a 1/8 in. joint, straight laying (10% extra), a 4 in. crushed stone base and 1 in. of damp bedding sand, with the default 10% allowance on the base and sand.
- Area = 12 × 10 = 120 ft²
- One paver with its joint = (6 + 0.125) × (9 + 0.125) = 55.89 in² = 0.388 ft²
- Pavers to cover the area = 120 ÷ 0.388 = 309.2, which is 310 rounded up
- With 10% extra, rounded up once: 309.2 × 1.10 = 340.1, so 341 pavers
- Base = 120 × (4 ÷ 12) × 1.10 = 44.0 ft³ ÷ 27 = 1.63 yd³ (1.25 m³)
- Base weight = 1.63 yd³ × 2,700 lb ÷ 2,000 = 2.20 tons (crushed stone)
- Sand = 120 × (1 ÷ 12) × 1.10 = 11.0 ft³ ÷ 27 = 0.41 yd³ (0.31 m³)
- Sand weight = 0.41 yd³ × 2,850 lb ÷ 2,000 = 0.58 tons (damp sand)
These are the same numbers the calculator shows when it first loads.
Method and formulas
Pavers = A × areas ÷ ((p + j) × (q + j)) × (1 + allowance ÷ 100), rounded up once
Rectangle: A = L × W · Circle: A = π × D² ÷ 4 · or enter the area you already know
Base or sand (yd³) = A × areas × depth × (1 + compaction ÷ 100) ÷ 27 · Weight = volume × loose weight
- A
- Area of one piece, ft² (m² in metric)
- p, q
- Paver length and width as bought
- j
- Joint between pavers
- depth
- Compacted depth of the base or the sand, in feet (inches ÷ 12)
Assumptions and limits
- Uniform compacted depth of base and sand over the whole paved area.
- The paver size and joint are what the reader enters; paver makers list nominal sizes, so the reader checks the actual size on the product sheet.
- The handbook weights are for loose material as dug and loaded; the weight of the load you buy depends on its grading, moisture and compaction.
- The allowance for cuts is a common practice figure that depends on the pattern and the shape of the area, not a figure from a standard.
- Gives quantities to order. It is not a paver-base design: it does not choose the base depth, stone grading, compaction, edge restraint or drainage for your traffic, soil and frost, and does not say whether a patio, walkway or driveway needs more.
- Counts pavers by area. It does not draw the laying pattern, work out cuts around curves, steps or obstacles, or count pallets, bundles, edge restraint or border pavers.
- Irregular or natural flagstone pieces are not counted by area of one repeated size; the page gives a count only for squared or rectangular pavers of one size.
- Joint (polymeric) sand is not worked out; use the manufacturer's coverage per bag.
- Cost is only what the reader's own prices give; no price is supplied by the page.
Reference tables
| Paver size | No joint | 1/8 in. joint | 1/4 in. joint |
|---|---|---|---|
| 4 × 8 in. | 450 | 430 | 411 |
| 6 × 6 in. | 400 | 384 | 369 |
| 6 × 9 in. | 267 | 258 | 250 |
| 8 × 8 in. | 225 | 219 | 212 |
| 12 × 12 in. | 100 | 98 | 96 |
| 16 × 16 in. | 57 | 56 | 55 |
| 12 × 24 in. | 50 | 50 | 49 |
| 24 × 24 in. | 25 | 25 | 25 |
Source: Calculated with the EngiFormula paver engine (method v1.0). 1 yd³ = 27 ft³, from the exact definitions 1 ft = 0.3048 m and 1 yd = 0.9144 m, NIST Special Publication 811 (2008 edition), Appendix B. Weights: Caterpillar Performance Handbook, Edition 50.
| Depth | Cubic yards per 100 ft² |
|---|---|
| 1 in | 0.31 |
| 2 in | 0.62 |
| 3 in | 0.93 |
| 4 in | 1.23 |
| 6 in | 1.85 |
| 8 in | 2.47 |
Source: Calculated with the EngiFormula paver engine (method v1.0). 1 yd³ = 27 ft³, from the exact definitions 1 ft = 0.3048 m and 1 yd = 0.9144 m, NIST Special Publication 811 (2008 edition), Appendix B. Weights: Caterpillar Performance Handbook, Edition 50.
Weight of base stone and sand
| Material | Loose kg/m³ | Loose lb/yd³ |
|---|---|---|
| Gravel — Dry | 1,510 | 2,550 |
| Gravel — Dry 6-50 mm (1/4"-2") | 1,690 | 2,850 |
| Stone — Crushed | 1,600 | 2,700 |
| Sand, dry | 1,420 | 2,400 |
| Sand, damp | 1,690 | 2,850 |
| Sand, wet | 1,840 | 3,100 |
Source: Caterpillar Performance Handbook, Edition 50 (AEXQ3330), Tables section, "Weight of Materials", page 27-6 (loose weights).
Values as printed in the handbook. The calculator uses the loose figure, because stone and sand are delivered loose. Moisture, grading and compaction change the weight of a real load.
Common uses
Paver patio or walkway
Choose Rectangle (or enter a known area), pick the paver size, set the joint and the laying pattern. For example, 200 ft² of herringbone with 6 × 9 in. pavers needs about 593 pavers.
Driveway apron or pool deck
Use the same inputs, and set the base depth from your plan or installer, which is usually deeper for vehicles. This page does not choose it.
Base and sand for a paver project
Enter the depths from your plan to see the crushed stone and bedding sand in yards and tons, then order by the unit your supplier sells in.
Materials cost from your own prices
Type your price per paver (or per square foot) and per ton of stone and sand. Leave a price empty to leave that line out.
Checking a supplier or contractor quote
Compare the paver count, base and sand on a quote with the result here. Change the allowance, joint and weights to match theirs.
Frequently asked questions
How do I calculate how many pavers I need?
Work out the area in square feet, then divide it by the area one paver covers including its joint, and add an allowance for cuts. For a 12 × 10 ft patio of 6 × 9 in. pavers with a 1/8 in. joint, one paver covers 0.388 ft², so 120 ÷ 0.388 = 309.2 pavers. With 10% extra that is 340.1, rounded up to 341.
How many pavers do I need per square foot?
It depends on the paver size and the joint. By the table above, 100 ft² takes 430 pavers of 4 × 8 in., 258 of 6 × 9 in., 98 of 12 × 12 in. and 25 of 24 × 24 in. with a 1/8 in. joint, before any allowance.
How much extra should I order for waste and cuts?
Straight laying needs less than herringbone or diagonal patterns, because edge cuts waste more of the paver. The page offers 10%, 15% and 20% as common practice, not figures from a standard. Curves, steps and several sizes need more. Enter your own figure if your supplier or installer gives one.
How much base and sand do I need under pavers?
Multiply the paved area by the compacted depth of each layer and add an allowance for compaction. For the 120 ft² example, a 4 in. base is 1.63 yd³ and 1 in. of sand is 0.41 yd³ with the default 10% allowance. The depths are yours to set from your plan.
How deep should the base under pavers be?
It depends on what the surface carries, the soil and the frost in your area, so a patio, a walkway and a driveway can differ. This page does not set a depth. Follow your paver maker's instructions, your plan or your installer. The table above shows what each depth costs in stone for 100 ft².
Do I need to include the joint (spacing) between pavers?
Yes, by a small amount. Each paver takes up its size plus the joint, so the same area takes fewer pavers than the plain area divided by the paver area. For 6 × 9 in. pavers with a 1/8 in. joint the difference is about 3.1%. Set the joint to 0 to ignore it.
How much do pavers cost?
This page supplies no price, because prices vary by region, product and supplier. Type your price per paver (or per square foot) and your prices per ton of base stone and sand to see a materials cost. Installation labour is not included.
How many pavers are on a pallet?
It depends on the product and the maker, so use the coverage per pallet or bundle on the supplier's sheet. This page gives the number of pavers and the area, not pallets.
Is this a sand paver calculator and a paver base calculator?
Yes. After the paver count it gives the volume of base stone and bedding sand under the pavers, from the depths you set. Take the base and sand depths from the paver maker or your plan.
Sources and references
- NIST Special Publication 811, Guide for the Use of the International System of Units (SI), 2008 edition, Appendix B (exact values for the inch, foot, yard and pound).
- Caterpillar Inc., Caterpillar Performance Handbook, Edition 50 (AEXQ3330, © 2021), Tables section, "Weight of Materials" (loose weights of crushed stone, dry gravel and dry, damp and wet sand).
- Area and count relations: plane geometry, as set out in the Method section above.
About this calculator
Scope and disclaimer
Calculates pavers, crushed stone base, bedding sand and a materials cost from the reader's size, depths and prices. Not a paver-base design, a laying-pattern drawing or a cut list.
This calculator gives information and preliminary estimates only. It is not professional design advice and does not replace the governing code, product instructions or a qualified professional's judgement for your project.